One Got Banged in Zih

by rdcosta @, Saturday, September 21, 2019, 17:05 (2610 days ago) @ Ironwood

From my experience the piles will be made of water resistant concrete and driven into "refusal" or as far as they can be driven, and then cut off at the proper level. The refusal depth will not be the same for every pile therefore they will end up being at different levels and cut off to match


Complete thread:

 RSS Feed of thread