<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Zihuatanejo-Ixtapa Message Board - Plain to Zih</title>
<link>https://www.zihuatanejo.net/tablero/</link>
<description>Information for visitors and locals about Zihuatanejo, Ixtapa, Troncones, Barra de Potosí and the surrounding region of the Costa Grande in Guerrero, Mexico</description>
<language>en</language>
<item>
<title>Plain to Zih</title>
<content:encoded><![CDATA[<p>The pier construction continues painfully slow. The <em>grua</em> is once again ashore, and the barge with the <em>pilotes</em> is still half sunk in front of the beach.</p>
<p>It looks like the pile-driving adapter for the <em>grua</em> has arrived but not yet been assembled. The 6 <em>pilotes</em> that have been driven have all been cut down to size. If you look closely in the photo towards where the end of the pier will eventually be you'll see a square metal frame that will be used to guide and set the <em>pilotes</em> in sets of 4. I didn't see the work barge in the bay this morning, but maybe they sent it for refueling to the marina in Ixtapa.</p>
<p>A new <em>lonchería</em> is opening up across the street. They've painted a colorful menu on their wall.<br />
<img src="http://www.zihuatanejo.net/images/temp/2019-10-07-muropintado-casalaplaya-lonchesdepierna.jpg" alt="[image]" /></p>
<p>This is as far as the pier construction has gotten.<br />
<img src="http://www.zihuatanejo.net/images/temp/2019-10-07-wide-pierconstruction.jpg" alt="[image]" /></p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=136660</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=136660</guid>
<pubDate>Mon, 07 Oct 2019 17:16:57 +0000</pubDate>
<dc:creator>ZihuaRob</dc:creator>
</item>
</channel>
</rss>
