<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Zihuatanejo-Ixtapa Message Board - Sotavento</title>
<link>https://www.zihuatanejo.net/tablero/</link>
<description>Information for visitors and locals about Zihuatanejo, Ixtapa, Troncones, Barra de Potosí and the surrounding region of the Costa Grande in Guerrero, Mexico</description>
<language>en</language>
<item>
<title>Sotavento (reply)</title>
<content:encoded><![CDATA[<p>I worked as a Union Carpenter in Chicago for many years on high rise buildings and many other projects.<br />
The Sotavento project looks as it has less progress from the previous year. I don’t believe that the steel rebar which is extended from previous concrete pours and been exposed and corroded should be encased in new concrete.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=141348</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=141348</guid>
<pubDate>Fri, 27 Mar 2020 00:22:03 +0000</pubDate>
<dc:creator>Roberto G.</dc:creator>
</item>
<item>
<title>Sotavento (reply)</title>
<content:encoded><![CDATA[<blockquote><p><a href="https://mexiconewsdaily.com/mexicolife/zihuatanejos-sotavento-resort/">https://mexiconewsdaily.com/mexicolife/zihuatanejos-sotavento-resort/</a></p>
<p>Some new PR.  Personally I can not believe it to be completed in 2021.  I counted 7 guys working and 1 on the beach handing out towels and raking the sand. Not the pace to be completed in 1 year from now.</p>
</blockquote><p>A month or so ago, we spoke on the beach with an associate of one of the principals. He said the plan was to build a 70 room hotel on the site of the demolished north tower, that height restrictions along La Ropa Rd. will limit  roadside building height to two stories, with a further five-to-seven stories extending down the slope. The existing building, in behind the new hotel, will be a parking garage. We didn't get to ask how, or if, the new hotel will tie into the rebuilt south tower condo building.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=141185</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=141185</guid>
<pubDate>Mon, 23 Mar 2020 03:31:41 +0000</pubDate>
<dc:creator>Ironwood</dc:creator>
</item>
<item>
<title>Sotavento</title>
<content:encoded><![CDATA[<p><a href="https://mexiconewsdaily.com/mexicolife/zihuatanejos-sotavento-resort/">https://mexiconewsdaily.com/mexicolife/zihuatanejos-sotavento-resort/</a></p>
<p>Some new PR.  Personally I can not believe it to be completed in 2021.  I counted 7 guys working and 1 on the beach handing out towels and raking the sand. Not the pace to be completed in 1 year from now.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=141131</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=141131</guid>
<pubDate>Sat, 21 Mar 2020 22:46:49 +0000</pubDate>
<dc:creator>Sunset Monger</dc:creator>
</item>
</channel>
</rss>
