<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Zihuatanejo-Ixtapa Message Board - Sotavento construction</title>
<link>https://www.zihuatanejo.net/tablero/</link>
<description>Information for visitors and locals about Zihuatanejo, Ixtapa, Troncones, Barra de Potosí and the surrounding region of the Costa Grande in Guerrero, Mexico</description>
<language>en</language>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>While there does seem to be some progress from when we were here last March, If you are hoping that it will be completed in your lifetime, I hope you’re in your 30’s.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=168790</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=168790</guid>
<pubDate>Sun, 03 Dec 2023 03:25:03 +0000</pubDate>
<dc:creator>Timmac</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>12/2/2023<br />
When we were here last year at this time,, I was pleasantly surprised to see construction activity.<br />
This year: Nothing</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=168788</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=168788</guid>
<pubDate>Sun, 03 Dec 2023 02:25:55 +0000</pubDate>
<dc:creator>From Anderson Island</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>Nope it was on the beach at the beach club.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166116</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166116</guid>
<pubDate>Fri, 05 May 2023 16:23:10 +0000</pubDate>
<dc:creator>Keytime</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>We think yoga was up at the street level in what we call the sales room, but absolutely no guarantees.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166104</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166104</guid>
<pubDate>Fri, 05 May 2023 03:16:13 +0000</pubDate>
<dc:creator>Talley Ho</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>We walk by every morning 6 days a week, early.  Then we paddle by about 8ish and check things out.</p>
<p>There is always some work going on.  In the last week or two, they have added, what we are calling the pool room, added the glass entry doors and painted the walls white.</p>
<p>In the last few months they have added what appears to be a large circular staircase heading toward the beach.</p>
<p>We want the project to finish because it will be wonderful if it does.  Location and all that jazz.  Very few workers, but kind of struggling along all the time.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166103</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166103</guid>
<pubDate>Fri, 05 May 2023 03:15:11 +0000</pubDate>
<dc:creator>Talley Ho</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>In reference the yoga instructor and building, are you talking about the foundation or the superstructure.<img src="images/smilies/devil.gif" alt=":devil:" title="devilish" /></p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166102</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166102</guid>
<pubDate>Fri, 05 May 2023 01:58:21 +0000</pubDate>
<dc:creator>Timmac</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>6 men will never get it done. They will start repairs before they get finished. Over the years I have considered the process Entertainment. Did anyone see their beach club Yoga instructor this high season? What building?</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166099</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166099</guid>
<pubDate>Thu, 04 May 2023 23:24:44 +0000</pubDate>
<dc:creator>Keytime</dc:creator>
</item>
<item>
<title>Sotavento construction (reply)</title>
<content:encoded><![CDATA[<p>I’ve heard they will be fully open by the end of the year. Of course, they have been saying that for the past three years. We were there in November and again in February. There was actually visible progress. My bet is that they are years away from finishing, assuming that they don’t run out of $$ like the two previous developers did</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166097</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166097</guid>
<pubDate>Thu, 04 May 2023 21:43:41 +0000</pubDate>
<dc:creator>Timmac</dc:creator>
</item>
<item>
<title>Sotavento construction</title>
<content:encoded><![CDATA[<p>Is the 6 man crew still making progress at the Sotavento?   While there this past winter I saw the crew working 6 days a week and wonder if that is still going on.  It would be wonderful to fix this eyesore.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=166096</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=166096</guid>
<pubDate>Thu, 04 May 2023 21:30:53 +0000</pubDate>
<dc:creator>daveJ</dc:creator>
</item>
</channel>
</rss>
