<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
<title>Zihuatanejo-Ixtapa Message Board - Catalina renovations?</title>
<link>https://www.zihuatanejo.net/tablero/</link>
<description>Information for visitors and locals about Zihuatanejo, Ixtapa, Troncones, Barra de Potosí and the surrounding region of the Costa Grande in Guerrero, Mexico</description>
<language>en</language>
<item>
<title>Catalina renovations? (reply)</title>
<content:encoded><![CDATA[<p>Saw an ad saying they would be closed for renovations the month of June.</p>
<p>The regular guy is out raking the beach at 6am still, and the lounge chairs are still in place on the sand.</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=171671</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=171671</guid>
<pubDate>Tue, 04 Jun 2024 21:17:31 +0000</pubDate>
<dc:creator>Talley Ho</dc:creator>
</item>
<item>
<title>Catalina renovations?</title>
<content:encoded><![CDATA[<p>I was sent a copy of what appears to be a Facebook post from a former Catalina employee. With my imperfect Spanish, it appears they are closed (or may be closing) for renovations reopening in July. (The translation says next July, but I bet this is wrong) Does anyone know what’s going on?</p>
]]></content:encoded>
<link>https://www.zihuatanejo.net/tablero/index.php?id=171670</link>
<guid>https://www.zihuatanejo.net/tablero/index.php?id=171670</guid>
<pubDate>Tue, 04 Jun 2024 21:15:17 +0000</pubDate>
<dc:creator>Timmac</dc:creator>
</item>
</channel>
</rss>
