Avatar

Unas ObservaZIHones

by ZihuaRob ⌂ @, Zihuatanejo, México, Friday, December 27, 2019, 10:24 (2512 days ago)

Taking a closer look and talking with fishermen, the general consensus is that the new pier and its landing platforms are being built too low. The landing platforms are currently at water level at a time when there are no waves. But during periods of any waves, high tides or mar de fondo the landings will be covered in water and quickly become slimy, thus causing accidents. Also, access to the landings is via a lot of steps. No access for wheelchairs! The landings SHOULD have been built with floating platforms accessible via RAMPS. That's my story and I'm sticking to it.

I also wish the new access to the mini-pier had been paved with adoquín (paving stones) instead of cement allowing the ground to receive and absorb water and to BREATHE.

A new awning has also been placed at the mini-pier so folks can wait in the shade for their boat ride.

Sure enjoyed our pozole yesterday at La Jaiba Feliz. Thank you, Talley Ho and to your fabulous and loving spouse, for the excellent company! Saludos y abrazos.

Not sure if these Flexifloats are still needed or if they will also soon be trucked out of here like the crane that was on one of them was.
[image]

The new entrance to the minipier by the obelisk.
[image]


Complete thread:

 RSS Feed of thread