A La Medida de Zih
The pilotes at the pier reconstruction site have all been cut to size. It really changes the appearance of the site. One of the pilotes at the very end had stood quite a bit taller than the rest, suggesting it was not driven as deep as all the others. I had always thought it would receive further piledriving but apparently not. I hope this isn't a future structural problem that causes the end of the pier to sink or shift and crack. Hopefully a qualified marine engineer already inspected it.
![[image]](http://www.zihuatanejo.net/images/temp/2020-01-20-reconstrucciondelmuelle-desdepanga.jpg)
My wife caught me snapping a photo at Owen's celebration of life ceremony the other day at Playa Las Gatas. The color of the water there is alluring and quite beautiful. I wish this area would be preserved and protected. This old mangrove tree and everything else that Owen worked so long and hard to protect are all now at risk of being destroyed and lost to short-sighted greed and development.
![[image]](http://www.zihuatanejo.net/images/temp/2020-01-20-owens92birthdaymemorial-playalasgatas-roberto-mangrovetree.jpg)

